(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Sehubungan dengan adanya Peraturan Baru Kementerian Perdagangan No.36 Tahun 2023 tentang Pembatasan Impor Barang, MISUMI Indonesia melakukan tindakan pencegahan. Lihat informasi detailnya di sini
    Due to New Regulation of Ministry Of Trade No.36 of 2023 concerning retrictions on imports of goods, MISUMI Indonesia do precautions measure. See detail information here
  • Nomor telepon alternatif Kontak Layanan Pelanggan : 021-29182911| 021-29182991 | 021-29182997 | 021-29182998
    Alternative telephone number Contact Customer Service: 021-29182911 | 021-29182991 | 021-29182997 | 021-29182998

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

[Features]
• Urethane foam with U-bolts for adjusting the piping level.
• UP type is designed to adjust the height of the piping.
• No thermal insulation effect is provided.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10640-0055
A10640-0060
A10640-0074
A10640-0089
A10640-0093
A10640-0106
A10640-0125
A10640-0130
A10640-0144
A10640-0159
A10640-0163
A10640-0178
A10640-0182
A10640-0197
A10640-0200
A10640-0214
A10640-0229
A10640-0233
A10640-0248
A10640-0252
A10640-0267
A10640-0271
A10640-0286
A10640-0303
A10640-0318
A10640-0322
A10640-0337
A10640-0341
A10640-0356
A10640-0375
A10640-0380
A10640-0394
A10640-0407
A10640-0411
A10640-0426
A10640-0445
A10640-0450
A10640-0464
A10640-0479
A10640-0483
A10640-0498
A10640-0515
A10640-0534
A10640-0549
A10640-0604
A10640-0619
Part NumberMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)
Heat-Retention Thickness T
(mm)
1 Piece(s) 20 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.740
1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.220
1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.225
1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.230
1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.240
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13420
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13425
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13430
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13440
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.720
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.725
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.730
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.740
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.620
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.625
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.630
1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.640
1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.520
1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.525
1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.530
1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.540
1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.320
1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.325
1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.330
1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.340
1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.120
1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.125
1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.130
1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.140
1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.150
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.325
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.330
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.340
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.350
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.825
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.830
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.840
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.850
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.225
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.230
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.240
1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.250
1 Piece(s) 17 Day(s) or more 200~Less than 300Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.340
1 Piece(s) 17 Day(s) or more 200~Less than 300Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.350
1 Piece(s) 25 Day(s) or more 300~Less than 400Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.640
1 Piece(s) 25 Day(s) or more 300~Less than 400Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.650

Loading...

  1. 1

Basic Information

Type Urethane U-Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)