(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Sehubungan dengan adanya Peraturan Baru Kementerian Perdagangan No.36 Tahun 2023 tentang Pembatasan Impor Barang, MISUMI Indonesia melakukan tindakan pencegahan. Lihat informasi detailnya di sini
    Due to New Regulation of Ministry Of Trade No.36 of 2023 concerning retrictions on imports of goods, MISUMI Indonesia do precautions measure. See detail information here
  • Nomor telepon alternatif Kontak Layanan Pelanggan : 021-29182911| 021-29182991 | 021-29182997 | 021-29182998
    Alternative telephone number Contact Customer Service: 021-29182911 | 021-29182991 | 021-29182997 | 021-29182998

Compact Direct Operated Solenoid Valve USB3 Series

Compact Direct Operated Solenoid Valve USB3 Series

A compact direct acting 2-port solenoid valve.
[Features]
·NC (open when energized) type.
·Connection port diameter: Rc1/8.
·Fluid: Air, water, dry air, low vacuum 1.33 × 10 squared Pa (abs).
·The stainless steel body material enables to control a wide range of fluids from air, water, dry air and low vacuum.
·Compact, long lifespan, flexible installation.
[Application]
·For space saving of equipment.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
USB3-6-1-AC100V
USB3-6-1-AC200V
USB3-6-1-B-AC100V
USB3-6-1-B-AC200V
USB3-6-1-B-DC12V
USB3-6-1-B-DC24V
USB3-6-1-D-AC100V
USB3-6-1-D-AC200V
USB3-6-1-D-DC12V
USB3-6-1-D-DC24V
USB3-6-1-DC12V
USB3-6-1-DC24V
USB3-6-1-E-AC100V
USB3-6-1-E-AC200V
USB3-6-1-E-DC12V
USB3-6-1-E-DC24V
USB3-6-1-H-AC100V
USB3-6-1-H-DC24V
USB3-6-1-J-AC100V
USB3-6-1-J-DC12V
USB3-6-1-J-DC24V
USB3-6-1-L-AC100V
USB3-6-1-L-DC24V
USB3-6-1-M-AC100V
USB3-6-1-M-AC200V
USB3-6-1-M-DC12V
USB3-6-1-M-DC24V
USB3-6-1-V-AC100V
USB3-6-1-V-DC12V
USB3-6-1-V-DC24V
USB3-6-1-W-AC200V
USB3-6-1-W-DC24V
USB3-6-2-AC100V
USB3-6-2-AC200V
USB3-6-2-B-AC100V
USB3-6-2-B-AC200V
USB3-6-2-B-DC12V
USB3-6-2-B-DC24V
USB3-6-2-D-AC100V
USB3-6-2-D-AC200V
USB3-6-2-D-DC12V
USB3-6-2-D-DC24V
USB3-6-2-DC12V
USB3-6-2-DC24V
USB3-6-2-E-AC100V
USB3-6-2-E-AC200V
USB3-6-2-E-DC12V
USB3-6-2-E-DC24V
USB3-6-2-H-AC100V
USB3-6-2-H-DC24V
USB3-6-2-J-AC100V
USB3-6-2-J-DC12V
USB3-6-2-J-DC24V
USB3-6-2-L-AC100V
USB3-6-2-L-DC24V
USB3-6-2-M-AC100V
USB3-6-2-M-DC12V
USB3-6-2-M-DC24V
USB3-6-2-V-AC100V
USB3-6-2-V-AC200V
Part NumberMinimum order quantityVolume DiscountDays to ShipConnection Type Plumbing Thread Nominal Orifice Dia.
(Ø)
Voltage Body/seal/coil combination Body Material Seal and Coil Combination
1 Piece(s) 16 Day(s) or more Rc1/81.6100 V ACBrass / nitrile rubber / tape winding--
1 Piece(s) 15 Day(s) or more Rc1/81.6200 V ACBrass / nitrile rubber / tape winding--
1 Piece(s) 16 Day(s) or more Rc1/81.6100 V ACB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 14 Day(s) or more Rc1/81.6200 V ACB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 14 Day(s) or more Rc1/81.612 V DCB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 18 Day(s) or more Rc1/81.624 V DCB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 15 Day(s) or more Rc1/81.6100 V ACD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 15 Day(s) or more Rc1/81.6200 V ACD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 15 Day(s) or more Rc1/81.612 V DCD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 18 Day(s) or more Rc1/81.624 V DCD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 10 Day(s) or more Rc1/81.612 V DCBrass / nitrile rubber / tape winding--
1 Piece(s) 18 Day(s) or more Rc1/81.624 V DCBrass / nitrile rubber / tape winding--
1 Piece(s) 15 Day(s) or more Rc1/81.6100 V ACE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 15 Day(s) or more Rc1/81.6200 V ACE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 10 Day(s) or more Rc1/81.612 V DCE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 18 Day(s) or more Rc1/81.624 V DCE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 15 Day(s) or more Rc1/81.6100 V ACH: Brass, nitrile rubber, tape winding, degreasing process--
1 Piece(s) 14 Day(s) or more Rc1/81.624 V DCH: Brass, nitrile rubber, tape winding, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/81.6100 V ACJ: Brass, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/81.612 V DCJ: Brass, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 14 Day(s) or more Rc1/81.624 V DCJ: Brass, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/81.6100 V ACL: Stainless steel, nitrile rubber, mold coil, degreasing process--
1 Piece(s) 18 Day(s) or more Rc1/81.624 V DCL: Stainless steel, nitrile rubber, mold coil, degreasing process--
1 Piece(s) 14 Day(s) or more Rc1/81.6100 V ACM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/81.6200 V ACM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/81.612 V DCM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 18 Day(s) or more Rc1/81.624 V DCM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/81.6100 V ACV: Brass, fluoroelastomer, mold coil, vacuum testing--
1 Piece(s) 15 Day(s) or more Rc1/81.612 V DCV: Brass, fluoroelastomer, mold coil, vacuum testing--
1 Piece(s) 15 Day(s) or more Rc1/81.624 V DCV: Brass, fluoroelastomer, mold coil, vacuum testing--
1 Piece(s) 15 Day(s) or more Rc1/81.6200 V ACW: Stainless steel, fluoroelastomer, mold coil, vacuum testing--
1 Piece(s) 11 Day(s) or more Rc1/81.624 V DCW: Stainless steel, fluoroelastomer, mold coil, vacuum testing--
1 Piece(s) 18 Day(s) or more Rc1/82.3100 V ACBrass / nitrile rubber / tape winding--
1 Piece(s) 10 Day(s) or more Rc1/82.3200 V ACBrass / nitrile rubber / tape winding--
1 Piece(s) 15 Day(s) or more Rc1/82.3100 V ACB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 15 Day(s) or more Rc1/82.3200 V ACB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 18 Day(s) or more Rc1/82.312 V DCB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 10 Day(s) or more Rc1/82.324 V DCB: Brass / fluoroelastomer / mold coil--
1 Piece(s) 10 Day(s) or more Rc1/82.3100 V ACD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 15 Day(s) or more Rc1/82.3200 V ACD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 15 Day(s) or more Rc1/82.312 V DCD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 18 Day(s) or more Rc1/82.324 V DCD: Stainless steel, nitrile rubber, mold coil--
1 Piece(s) 10 Day(s) or more Rc1/82.312 V DCBrass / nitrile rubber / tape winding--
1 Piece(s) 18 Day(s) or more Rc1/82.324 V DCBrass / nitrile rubber / tape winding--
1 Piece(s) 18 Day(s) or more Rc1/82.3100 V ACE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 15 Day(s) or more Rc1/82.3200 V ACE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 10 Day(s) or more Rc1/82.312 V DCE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 18 Day(s) or more Rc1/82.324 V DCE: Stainless steel / fluoroelastomer / mold coil--
1 Piece(s) 15 Day(s) or more Rc1/82.3100 V ACH: Brass, nitrile rubber, tape winding, degreasing process--
1 Piece(s) 18 Day(s) or more Rc1/82.324 V DCH: Brass, nitrile rubber, tape winding, degreasing process--
1 Piece(s) 18 Day(s) or more Rc1/82.3100 V ACJ: Brass, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/82.312 V DCJ: Brass, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 10 Day(s) or more Rc1/82.324 V DCJ: Brass, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/82.3100 V ACL: Stainless steel, nitrile rubber, mold coil, degreasing process--
1 Piece(s) 18 Day(s) or more Rc1/82.324 V DCL: Stainless steel, nitrile rubber, mold coil, degreasing process--
1 Piece(s) 14 Day(s) or more Rc1/82.3100 V ACM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/82.312 V DCM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 10 Day(s) or more Rc1/82.324 V DCM: Stainless steel, fluoroelastomer, mold coil, degreasing process--
1 Piece(s) 15 Day(s) or more Rc1/82.3100 V ACV: Brass, fluoroelastomer, mold coil, vacuum testing--
1 Piece(s) 15 Day(s) or more Rc1/82.3200 V ACV: Brass, fluoroelastomer, mold coil, vacuum testing--

Loading...

Basic Information

Type Electromagnetic Applicable Fluid Air / Water / Vacuum Operating Environment Standard
Switching Type 2-Port Normally Closed Driving Type Linear Motion Type Operating Temperature Range(°C) -10::60
Number of Solenoids Single Application Single Item

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)