• Due to the typhoon(Hagibis) in Japan, delivery of some products may be delayed. We apologize for any inconvenience and thank you for your understanding

MHW flexible coupling disk type

MHW flexible coupling disk type

Backlash "0"

[Features]
· Disk type flexible coupling.
· Stainless steel disk allows eccentricity, angle deviation, and end play.

PDF

Part Number

Configured Part Number is shown.

Part Number
MHW-32C-6-6
MHW-32C-6-7-BT
MHW-32C-6-8
MHW-32C-6-9-BT
MHW-32C-6-10
MHW-32C-7-BT-7-BT
MHW-32C-7-BT-8
MHW-32C-7-BT-9-BT
MHW-32C-7-BT-10
MHW-32C-8-8
MHW-32C-8-9-BT
MHW-32C-8-10
MHW-32C-9-BT-9-BT
MHW-32C-9-BT-10
MHW-32C-9-BT-10-KT
MHW-32C-9-BT-KT-9-BT
MHW-32C-9-BT-KT-9-BT-KT
MHW-32C-9-BT-KT-10
MHW-32C-9-BT-KT-10-KT
MHW-32C-10-10
MHW-32C-10-KT-10
MHW-32C-10-KT-10-KT
MHW-40C-8-8
MHW-40C-8-9-BT
MHW-40C-8-10
MHW-40C-8-11
MHW-40C-8-12
MHW-40C-8-13-BT
MHW-40C-8-14
MHW-40C-9-BT-9-BT
MHW-40C-9-BT-10
MHW-40C-9-BT-10-KT
MHW-40C-9-BT-11
MHW-40C-9-BT-11-KT
MHW-40C-9-BT-12
MHW-40C-9-BT-12-KT
MHW-40C-9-BT-13-BT
MHW-40C-9-BT-13-BT-KT
MHW-40C-9-BT-14
MHW-40C-9-BT-14-KT
MHW-40C-9-BT-KT-9-BT
MHW-40C-9-BT-KT-9-BT-KT
MHW-40C-9-BT-KT-10
MHW-40C-9-BT-KT-10-KT
MHW-40C-9-BT-KT-11
MHW-40C-9-BT-KT-11-KT
MHW-40C-9-BT-KT-12
MHW-40C-9-BT-KT-12-KT
MHW-40C-9-BT-KT-13-BT
MHW-40C-9-BT-KT-13-BT-KT
MHW-40C-9-BT-KT-14
MHW-40C-9-BT-KT-14-KT
MHW-40C-10-10
MHW-40C-10-11
MHW-40C-10-11-KT
MHW-40C-10-12
MHW-40C-10-12-KT
MHW-40C-10-13-BT
MHW-40C-10-13-BT-KT
MHW-40C-10-14
Part NumberVolume DiscountDays to ShipRoHSAllowable Torque Range
(N•m)
Shaft Bore Dia. (machined) D1
(Ø)
Shaft Bore Dia. (machined) D2
(Ø)
O.D.
(Ø)
Full Length
(mm)
Maximum Range of Rotation Number
(r/min)
Normal Torque
(N•m)
Max. Rotational Speed
(r/min)
Allowable Lateral Misalignment Range
(mm)
Allowable Lateral Misalignment
(mm)
Allowable Axial Misalignment
(mm)
Moment of Inertia
(kg・m2)
Additional Work Keyway
13 Day(s) or more 101.01~3.0066324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreNA
14 Day(s) or more 101.01~3.0067324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
13 Day(s) or more 101.01~3.0068324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreNA
14 Day(s) or more 101.01~3.0069324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
13 Day(s) or more 101.01~3.00610324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreNA
14 Day(s) or more 101.01~3.0077324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
14 Day(s) or more 101.01~3.0078324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
14 Day(s) or more 101.01~3.0079324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
14 Day(s) or more 101.01~3.00710324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
13 Day(s) or more 101.01~3.0088324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreNA
14 Day(s) or more 101.01~3.0089324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
13 Day(s) or more 101.01~3.00810324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreNA
14 Day(s) or more 101.01~3.0099324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
14 Day(s) or more 101.01~3.00910324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleNA
14 Day(s) or more 101.01~3.00910324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleD2 Hole
14 Day(s) or more 101.01~3.0099324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleD1 Hole
14 Day(s) or more 101.01~3.0099324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleBoth Sides
14 Day(s) or more 101.01~3.00910324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleD1 Hole
14 Day(s) or more 101.01~3.00910324010001~780002190000.02~0.20.15±0.46.2×10-6Additional Work Shaft HoleBoth Sides
13 Day(s) or more 101.01~3.001010324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreNA
14 Day(s) or more 101.01~3.001010324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreD1 Hole
14 Day(s) or more 101.01~3.001010324010001~780002190000.02~0.20.15±0.46.2×10-6Standard Shaft BoreBoth Sides
13 Day(s) or more 103.01~5.0088404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
14 Day(s) or more 103.01~5.0089404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
13 Day(s) or more 103.01~5.00810404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
13 Day(s) or more 103.01~5.00811404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
13 Day(s) or more 103.01~5.00812404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
14 Day(s) or more 103.01~5.00813404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
13 Day(s) or more 103.01~5.00814404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
14 Day(s) or more 103.01~5.0099404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.00910404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.00910404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD2 Hole
14 Day(s) or more 103.01~5.00911404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.00911404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD2 Hole
14 Day(s) or more 103.01~5.00912404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.00912404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD2 Hole
14 Day(s) or more 103.01~5.00913404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.00913404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD2 Hole
14 Day(s) or more 103.01~5.00914404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.00914404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD2 Hole
14 Day(s) or more 103.01~5.0099404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD1 Hole
14 Day(s) or more 103.01~5.0099404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleBoth Sides
14 Day(s) or more 103.01~5.00910404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD1 Hole
14 Day(s) or more 103.01~5.00910404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleBoth Sides
14 Day(s) or more 103.01~5.00911404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD1 Hole
14 Day(s) or more 103.01~5.00911404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleBoth Sides
14 Day(s) or more 103.01~5.00912404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD1 Hole
14 Day(s) or more 103.01~5.00912404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleBoth Sides
14 Day(s) or more 103.01~5.00913404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD1 Hole
14 Day(s) or more 103.01~5.00913404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleBoth Sides
14 Day(s) or more 103.01~5.00914404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD1 Hole
14 Day(s) or more 103.01~5.00914404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleBoth Sides
13 Day(s) or more 103.01~5.001010404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
13 Day(s) or more 103.01~5.001011404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
14 Day(s) or more 103.01~5.001011404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreD2 Hole
13 Day(s) or more 103.01~5.001012404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA
14 Day(s) or more 103.01~5.001012404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreD2 Hole
14 Day(s) or more 103.01~5.001013404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleNA
14 Day(s) or more 103.01~5.001013404610001~780004150000.02~0.20.2±0.51.6×10-5Additional Work Shaft HoleD2 Hole
41 Day(s) or more -3.01~5.001014404610001~780004150000.02~0.20.2±0.51.6×10-5Standard Shaft BoreNA

Loading...

Basic Information

Type Disc Type Allowable Misalignment Angular Misalignment / Axial Misalignment Application Standard / Stepping Motor
Features Backlash 0 Body Material A2017 Product Category Coupling body
Allowable Angular Misalignment(deg) 2 Disc Material SUS301 Construction Clamping Type

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)