(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pembayaran dengan kartu kredit untuk sementara tidak tersedia karena kendala sistem. Sementara waktu Anda dapat meggunakan metode Pembayaran di Muka atau QRIS. Untuk informasi lebih lanjut, silakan hubungi Customer Service : TEL: 021-8984-0008 E-mail: cs@misumi.co.id. WA: 08118984008. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Credit card payments are temporarily unavailable due to system issues. Meanwhile, you can use the Advance Payment method or QRIS. For further information, please contact Customer Service: TEL: 021-8984-0008 E-mail: cs@misumi.co.id. WA: 08118984008. We apologize for any inconvenience caused.
  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 21/4/2024 sampai dengan 5:00 pada tanggal 22/4/2024. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 21/4/2024 to 5:00 (WIB) 22/4/2024. We apologize for the inconvenience.
  • Sehubungan dengan adanya Peraturan Baru Kementerian Perdagangan No.36 Tahun 2023 tentang Pembatasan Impor Barang, MISUMI Indonesia melakukan tindakan pencegahan. Lihat informasi detailnya di sini
    Due to New Regulation of Ministry Of Trade No.36 of 2023 concerning retrictions on imports of goods, MISUMI Indonesia do precautions measure. See detail information here

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip)

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip)

Assembly-type Standing Band for SGP Pipe and Stainless Steel (Thick) Pipe

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10324-0017
A10324-0021
A10324-0036
A10324-0055
A10324-0060
A10324-0074
A10324-0089
A10324-0093
A10324-0106
A10324-0125
A10324-0130
A10324-0144
A10324-0159
A10324-0163
A10324-0178
A10324-0182
A10324-0197
A10350-0017
A10350-0021
A10350-0036
A10350-0055
A10350-0060
A10350-0074
A10350-0089
A10350-0093
A10350-0106
A10350-0125
A10350-0130
A10350-0144
A10350-0159
A10350-0163
A10350-0178
A11212-0015
A11212-0020
A11212-0034
A11212-0049
A11212-0053
A11212-0068
A11212-0072
A11212-0087
A11212-0091
A11212-0104
A11212-0119
A11212-0123
Part NumberMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)
1 Piece(s) 16 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating15A1/221.7
1 Piece(s) 16 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating20A3/427.2
1 Piece(s) 16 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating25A134
1 Piece(s) 14 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7
1 Piece(s) 16 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6
1 Piece(s) 16 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating50A260.5
1 Piece(s) 14 Day(s) or more 70~Less than 80[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3
1 Piece(s) 16 Day(s) or more 80~Less than 90[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating80A389.1
1 Piece(s) 16 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6
1 Piece(s) 16 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating100A4114.3
1 Piece(s) 14 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating125A5139.8
1 Piece(s) 14 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating150A6165.2
1 Piece(s) 15 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating200A8216.3
1 Piece(s) 15 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating250A10267.4
1 Piece(s) 15 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating300A12318.5
1 Piece(s) 15 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating350A14355.6
1 Piece(s) 20 Day(s) or more 400~Less than 500[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating400A16406.4
1 Piece(s) 16 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7
1 Piece(s) 15 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2
1 Piece(s) 16 Day(s) or more 30~Less than 40[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A134
1 Piece(s) 16 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7
1 Piece(s) 16 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6
1 Piece(s) 16 Day(s) or more 60~Less than 70[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5
1 Piece(s) 16 Day(s) or more 70~Less than 80[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3
1 Piece(s) 14 Day(s) or more 80~Less than 90[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1
1 Piece(s) 16 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3
1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8
1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2
1 Piece(s) 13 Day(s) or more 200~Less than 300[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3
1 Piece(s) 13 Day(s) or more 200~Less than 300[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4
1 Piece(s) 13 Day(s) or more 300~Less than 400[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5
1 Piece(s) 16 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6
1 Piece(s) 13 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)15A1/221.7
1 Piece(s) 13 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2
1 Piece(s) 13 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)25A134
1 Piece(s) 13 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)32A1 1/442.7
1 Piece(s) 13 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)40A1 1/248.6
1 Piece(s) 13 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)50A260.5
1 Piece(s) 13 Day(s) or more 70~Less than 80[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3
1 Piece(s) 13 Day(s) or more 80~Less than 90[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)80A389.1
1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)100A4114.3
1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)125A5139.8
1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)150A6165.2
1 Piece(s) 15 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)200A8216.3

Loading...

  1. 1

Basic Information

Type Vertical band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)