• Due to the typhoon in Japan, large-scale blackout have occurred in Narita city where Misumi Shipping center is located, and the recovery is being delayed. (Newspaper article https://the-japan-news.com/news/article/0005997110 source: The Japan News) Because of the above reason, delivery of some products may be delayed. We apologize for any inconvenience and thank you for your understanding.

KONTEC Building Hardware

Search by specifying the lower class category

Days to Ship
  • All
  • 2 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 14 Day(s) or Less
  • 15 Day(s) or Less
  • 16 Day(s) or Less
  • 17 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Junction Hardware Types for Woodworking
Types of Parts / Hardware for Foundation
Vent Types
Inspection Opening Types
Clothes Drying Hardware Types
Roof Manhole / Ramp Types

    Neatly Bendable Plate

    Brand

    KONTEC

    Product Series

    Neatly Bendable Plate

    Days to Ship 12 Day(s) or more
    TypeJunction Hardware for Woodworking
    Junction Hardware Types for WoodworkingStrip / Flat Hardware / Plate
    Types of Parts / Hardware for Foundation-
    Vent Types-
    Inspection Opening Types-
    Clothes Drying Hardware Types-
    Roof Manhole / Ramp Types-

    Loading...

    1. 1

    Related Categories to Building Hardware