• Due to the typhoon in Japan, large-scale blackout have occurred in Narita city where Misumi Shipping center is located, and the recovery is being delayed. (Newspaper article https://the-japan-news.com/news/article/0005997110 source: The Japan News) Because of the above reason, delivery of some products may be delayed. We apologize for any inconvenience and thank you for your understanding.

Building Hardware(Type:Inspection Opening)

Search by specifying the lower class category

Days to Ship
  • All
  • 2 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 14 Day(s) or Less
  • 15 Day(s) or Less
  • 16 Day(s) or Less
  • 17 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Junction Hardware Types for Woodworking
Types of Parts / Hardware for Foundation
Vent Types
Inspection Opening Types
Clothes Drying Hardware Types
Roof Manhole / Ramp Types

    Aluminum Ceiling Inspection Door

      SUS Meter Inspection Door

        Base Change Inspection Door

          X-90 Stairs Underfloor Inspection Door

            Meter Inspection Door AT-Type

              Aluminum Ceiling Inspection Door

                New-Type Ceiling Inspection Door

                  Aluminum Underfloor Inspection Door

                    Underfloor Inspection Door with Built-in Rotating Handle

                      Ceiling Inspection Door (Made Of Aluminum)

                        Sealed Ceiling Inspection Door (Made Of Aluminum)

                          Easy Hatch (Made Of Stainless Steel)

                            Easy Hatch With Key (Made Of Stainless Steel)

                              Simple Sealed Ceiling Hatch

                                Wall Inspection Door Frame I Type

                                  PVC Inspection Frame T Type (Ceiling/Wall Dual Use)

                                  Brand

                                  YAHATA

                                  SUGITA ACE

                                  SUGITA ACE

                                  SUGITA ACE

                                  SUGITA ACE

                                  SHIMIZU

                                  SHIMIZU

                                  SHIMIZU

                                  SHIMIZU

                                  SINJI

                                  SINJI

                                  SINJI

                                  SINJI

                                  MARUKI HARDWARE

                                  FUKUVI

                                  FUKUVI

                                  Product Series

                                  Aluminum Ceiling Inspection Door

                                  SUS Meter Inspection Door

                                  Base Change Inspection Door

                                  X-90 Stairs Underfloor Inspection Door

                                  Meter Inspection Door AT-Type

                                  Aluminum Ceiling Inspection Door

                                  New-Type Ceiling Inspection Door

                                  Aluminum Underfloor Inspection Door

                                  Underfloor Inspection Door with Built-in Rotating Handle

                                  Ceiling Inspection Door (Made Of Aluminum)

                                  Sealed Ceiling Inspection Door (Made Of Aluminum)

                                  Easy Hatch (Made Of Stainless Steel)

                                  Easy Hatch With Key (Made Of Stainless Steel)

                                  Simple Sealed Ceiling Hatch

                                  Wall Inspection Door Frame I Type

                                  PVC Inspection Frame T Type (Ceiling/Wall Dual Use)

                                  Days to Ship 10 Day(s) or more 13 Day(s) or more 12 Day(s) or more 13 Day(s) or more 14 Day(s) or more 11 Day(s) or more 11 Day(s) or more 11 Day(s) or more 12 Day(s) or more 15 Day(s) or more 15 Day(s) or more 16 Day(s) or more 16 Day(s) or more 15 Day(s) or more 14 Day(s) or more 12 Day(s) or more
                                  TypeInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection OpeningInspection Opening
                                  Junction Hardware Types for Woodworking----------------
                                  Types of Parts / Hardware for Foundation----------------
                                  Vent Types----------------
                                  Inspection Opening TypesWall / Ceiling Inspection OpeningMeter Inspection OpeningMeter Inspection OpeningUnder Floor Inspection OpeningMeter Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection OpeningUnder Floor Inspection OpeningUnder Floor Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection OpeningWall / Ceiling Inspection Opening
                                  Clothes Drying Hardware Types----------------
                                  Roof Manhole / Ramp Types----------------

                                  Loading...

                                  1. 1

                                  Related Categories to Building Hardware