(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Sehubungan dengan adanya Peraturan Baru Kementerian Perdagangan No.36 Tahun 2023 tentang Pembatasan Impor Barang, MISUMI Indonesia melakukan tindakan pencegahan. Lihat informasi detailnya di sini
    Due to New Regulation of Ministry Of Trade No.36 of 2023 concerning retrictions on imports of goods, MISUMI Indonesia do precautions measure. See detail information here
  • Nomor telepon alternatif Kontak Layanan Pelanggan : 021-29182911| 021-29182991 | 021-29182997 | 021-29182998
    Alternative telephone number Contact Customer Service: 021-29182911 | 021-29182991 | 021-29182997 | 021-29182998

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

[Features]
• Urethane foam with U-bolts for adjusting the piping level.
• UP type is designed to adjust the height of the piping.
• No thermal insulation effect is provided.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10640-0106
A10640-0125
A10640-0130
A10640-0144
A10649-0101
A10649-0116
A10649-0135
A10649-0140
A10649-0633
Part NumberMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)
Heat-Retention Thickness T
(mm)
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13420
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13425
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13430
1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13440
1 Piece(s) 14 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13420
1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13425
1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13430
1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13440
1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13450

Loading...

  1. 1

Basic Information

Type Urethane U-Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)