(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Sehubungan dengan adanya Peraturan Baru Kementerian Perdagangan No.36 Tahun 2023 tentang Pembatasan Impor Barang, MISUMI Indonesia melakukan tindakan pencegahan. Lihat informasi detailnya di sini
    Due to New Regulation of Ministry Of Trade No.36 of 2023 concerning retrictions on imports of goods, MISUMI Indonesia do precautions measure. See detail information here
  • Nomor telepon alternatif Kontak Layanan Pelanggan : 021-29182911| 021-29182991 | 021-29182997 | 021-29182998
    Alternative telephone number Contact Customer Service: 021-29182911 | 021-29182991 | 021-29182997 | 021-29182998

TOYO DRILL Long Neck Ball End Mills (Carbide)(work material:general steel)

Days to Ship
  • All
  • Same day
  • 2 Day(s) or Less
  • 8 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 15 Day(s) or Less
  • 16 Day(s) or Less
  • 17 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
R Size(mm)
Blade length (ℓ)(mm)
Underneck length (ℓ1)(mm)
Shank diameter (d)(mm)
Number of flutes(sheet)
Overall Length (L)(mm)
work material
R Precision(μm)
Machining Application
Coating
Type

    DA Long Ball End Mill DABL

    Brand

    TOYO DRILL

    Product Series

    DA Long Ball End Mill DABL

    Days to Ship 11 Day(s) or more
    R Size(mm)4 ~ 5
    Blade length (ℓ)(mm)16 ~ 24
    Underneck length (ℓ1)(mm)-
    Shank diameter (d)(mm)8 ~ 10
    Number of flutes(sheet)2
    Overall Length (L)(mm)160 ~ 180
    work materialgeneral steel[○]
    R Precision(μm)-
    Machining Application-
    CoatingNon-Coated
    TypeLong-Neck Ball

    Loading...

    1. 1

    Related Categories to Long Neck Ball End Mills (Carbide)